Tally Ho Drilling Highlights

Drilling Highlights 2006 - 2007

Hole No.

Interval
From To (m)

Length
(m)

Silver
(g/t)

Gold
(g/t)

Copper
(%)

Lead
 (%)

Zinc
(%)

Silver Equiv.
(g/t)

GRDD5

12-36m
incl 20-24m
incl 28-34m

24m
4m
6m

132
190
288

0.10
0.05
0.29

0.25
0.37
0.37

0.13
0.35
0.07

2.79
8.11
2.2

450
1021
586

GRDD6

26-66m
incl 28-37m
incl 39-51m
161-165m
253-257m

40m
9m
12m
4m
4m

184
662
67
94
97

0.23
0.43
0.20
5.84
0.03

0.26
0.67
0.22
0.17
0.01

0.01
0.13
0.01
0.07
0.00

2.50
3.28
4.20
0.01
0.00

483
1132
509
445
102

GRDD7

 63-67m

4m

293

0.04

0.69

0.46

11.73

1526

GRDD8

23-46m
incl 30-35m
incl 55-62m

23m
5m
7m

230
704
233

0.19
0.68
0.42

0.43
1.19
0.39

0.43
1.72
0.06

2.64
6.58
4.26

586
1647
728

GRRC37

28-52m
incl 34-38m
incl 41-43m

24m
4m
2m

40
84
76

0.10
0.14
0.18

0.15
0.21
0.13

0.19
0.54
0.18

5.51
11.15
12.65

585
1170
1274

GRRC38

50 - 52
75 - 76

2m
1m

130
132

4.07
0.31

0.28
0.37

0.12
0.10

0.82
3.51

485
550

GRRC40

56 - 58
& 86 - 90
& 99 - 100

2m
4m
1m

633
129
74

0.27
0.08
0.31

0.67
0.37
0.47

0.05
0.01
0.28

9.74
1.45
12.2

1681
344
1314

GRRC41

31 - 35

4m

61

0.18

0.39

0.15

4.91

609

GRRC42

50 - 51
90 - 91

1m
1m

817
131

0.12
0.11

1.42
0.12

0.07
0.09

5.77
0.06

1654
170

GRRC49

131 - 133

2m

87

0.03

0.25

0.05

1.65

293

GRRC050

98 - 100

2m

75

0.03

0.14

0.03

0.23

128

GRRC51

128 - 129

1m

139

0.03

0.38

<0.01

0.75

290

GRDD20

123 - 124

1m

219

0.01

0.01

<0.01

0.02

224

GRRC26

16 – 30
(incl 16 – 22)
30 - 70
(incl 60 – 70)
76 - 78

14m
6m
40m
10m
2m

80
165
42
128
-

-
0.12
-
-
3.16

2.94
3.56
0.65
0.8
-

-
-
-
-
-

-
0.3
-
0.36
-

349
558
101
277
170

GRRC29

76 – 78
46 – 72
(incl 50 – 58)

2m
26m
8m

507
46
70

1.07

0.16

23.3
4.34
9.56

-
-
-

0.72
0.18
0.28

2,830
479
1,007

GRRC30

 52 – 58
(incl 56 – 58)

6m
2m

126
304

0.13

4.23
7.42

1.48
0.74

0.29
0.62

622
1,143

GRRC32

84-94

10m

100

0.21

2.49

-

0.32

395

Note:

  • True widths of the intervals quoted are not listed, as the orientation of the mineralisation is uncertain.
  • Macmin Silver Ltd is primarily a silver exploration and mining company and as such reports silver equivalent values to provide shareholders and investors with a more easily quantifiable basis for comparison with other silver-bearing projects where the metal ratios are different from those at Tally Ho.
  • It is the Company’s opinion that each of the elements included in the Silver equivalent calculation have a reasonable potential to be recovered if the project proceeds to mining, however no metallurgical testing to determine recoveries has been undertaken to date.

The calculation process and metal prices in the calculation of Silver equivalents are:

 

Metal

Price in AUD

Factors

Value Calculation

Metal value in AUD

 

A

 

B

 

C

 

 

 

1

Silver

 

g/t

$15.00

per oz

31.1035

gms per oz

1A x 1B/1C =

M

2

Gold

 

g/t

$800.00

per oz

31.1035

gms per oz

2A x 2B/2C =

N

3

Copper

 

%

$4.66

per lb

0.045359

% per lb

3A x 3B/3C =

O

4

Lead

 

%

$0.66

per lb

0.045359

% per lb

4A x 4B/4C =

P

5

Zinc

 

%

$2.00

per lb

0.045359

% per lb

5A x 5B/5C =

Q

Sum of metal values
Metal equivalent in Silver g/t

S =
ME =

M+N+O+P+Q
S / 1B x 1C (g/t)